Building Envelope, Gutters and Sealant

Walk the outside of every building twice a year and catch water getting in, cracks growing and railings loosening. FixGrid standard: fall inspection before the first fall frost or Nov 1 (sealant needs about 40 °F and up); spring inspection within 30 days after the last spring frost; gutter cleaning 30 days after the first fall frost.

FMP · 20-yr maintenance pro · v1.0, Oct 2026
Page 1 of 2

Walls, joints, windows

Walls, joints, windows

The printable PDF has 10 blank lines with these columns.

Building / elevation
Write in
Cladding cracks (brick, stucco, siding) 1/8 in+
Tick
Sealant at windows, doors, joints intact
Tick
Foundation cracks 1/4 in+ or horizontal / stair-step / bulging
Tick
Grew since last season?
Y / N
Result
OK / Monitor (photo + width) / Needs repair

Guards and railings

Balconies, breezeways, stairs: every round. The printable PDF has 8 blank lines with these columns.

Location
Write in
Push test: rail solid, posts tight, no rot or rust at the base
Tick
Height and 4-in opening measured once (first round or after work)
Write in
Result
OK / Fixed / Needs repair

Checks

  1. 1
    Gutters cleaned (fall, 30 days after first frost); extra cleanings if heavy treesMark: Done / Due
  2. 2
    Spring: gutters and downspouts flowing, discharge away from the foundationMark: OK / Needs repair
  3. 3
    Any guard under 36 in, or a loose rail: ticket openedMark: Done / N/A
  4. 4
    Cracks below the threshold photographed with a crack gauge card for next season's compareMark: Done / N/A

If Needs repair

What to do

  • A loose railing: block it off and ticket it the same day.
  • Guards under 42 in are noted for review (older buildings may be legal at 36 in); under 36 in always opens a ticket.

Call a licensed vendor when

  • Horizontal, stair-step, bulging or offset foundation cracks: refer to an engineer.

FixGrid standard practice. Your local codes and your equipment manufacturer's instructions come first.