Backflow, fire pump, generator, boiler, elevator — every regulated test tracked to its due date. Every test on record — timestamped, attributed, and pulled up in seconds when the inspector asks. The deadline finds you first.
Grid Apogee is FixGrid's regulated-systems compliance layer — it tracks the test-and-inspection cadence for fire pumps, backflow, generators, boilers, and elevators, and opens a work order ahead of each due date, linked to the log form the tech fills in from the ticket.
Regulated tests don't fail because someone refuses to do them — they fail because a spreadsheet of due dates lived in one person's head, and that person got busy. Apogee makes the calendar the system's job: every regulated asset, its cadence, its proof. When something comes due, it doesn't wait to be noticed.
A backflow test comes due. Apogee opens the work order, the tech logs the result from the ticket as a timestamped, attributed entry, and the backflow test's due date moves on its own. Months later it's still on record, pulled up in seconds when a lender asks. Every step is the system's, not a sticky note's.
Each regulated system keeps its own log in Grid Apogee — every test with its date, who did it, the result and the report, tied to the asset it belongs to and linked to the ticket when it's logged from one. Instead of a shoebox of paper certificates and a spreadsheet in someone's head, the whole history lives in one place an auditor, insurer, or lender can actually follow.
Going deeper: the NFPA 25 fire pump testing requirements for multifamily, how to plan an NFPA 70B electrical maintenance budget, and our free compliance checklists.
A 30-minute walkthrough30-minute call on your own regulated systems. Watch a due test open its own ticket, log a result from it, and pull up the record a lender would ask for.